Workshop - Machines Roll Out

And after the second day the excavators had footings cut and the slab set down complete. Pretty happy with the volume of clay they were able to cut out. Next step is to sort out the drainage for the path for novacoil drain and the channel drain in front of the garage door before the block layer arrives.


No comments:

Post a Comment